Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Other (infrastructure-related) |
Tags: | chisholmtrail |
Date time: | 5.04pm, Friday 23rd April, 2021 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | kenwarner |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Ken Warner |
Area: | Cambridge |
Still work to do on the ramp south of the Chisholm Trail bridge, where conditions were tricky on the old alignment of the brook.
Comments reflect the views of the original submitter only.