Add to Gallery: | Add this photo to a Gallery |
Category: | A track or path other than a cycleway mainly for walking: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 9.25am, Saturday 1st May, 2021 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Blaydon |
There appears to be building work which has blocked a path which has been used by people on foot for several decades. This type of piecemeal nibbling away at footpaths is a significant deterrent to walking as it makes journeys on foot longer and more convuluted.
Comments reflect the views of the original submitter only.