Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: A problem that needs to be fixed |
Tags: | ncn65, puddling, rain, scarboroughbridge, transpenninetrail, water, york |
Date time: | 11.04am, Thursday 24th September, 2020 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[UPDATE: #174507] [Image taken 24.9.20] Scarborough Bridge, York. Puddling on the new bridge (completed February 2019). The water remains after rain stops. It hugely reduces the usable width for pedestrians, cyclists and wheelchair users. Puddling at other end today: #168504 and in May 2021: #168506, #169464. Weeds growing in drainage channels in June 2021: #170160 and September 2021: #174558. Positive images of Scarborough Bridge: #169805
Comments reflect the views of the original submitter only.