Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | marygatecarpark, york |
Date time: | 2.56pm, Thursday 6th May, 2021 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[See update: #168748] [Image taken 6.5.21] Marygate car park, York. The route (the section in which these pedestrians are walking) is open at its new width. Wider than the original (see: #166422) but much less than the covid-19 coned off popup: #157641. The bays inside the cones will revert to car parking. All images today: #168549, #168550, #168551, #168552, #168553, #168554, #168555, #168556, #168557, #168558, #168559, #168560, #168561, #168562, #168563, #168564, #168565. Tier hire scooters/cycles see: #164663
Comments reflect the views of the original submitter only.