Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | junction, kerb, pavementparking, shareduse, whitecart |
Date time: | 3.37pm, Tuesday 4th May, 2021 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The shared footway has been built along Spean Street without any thought for those that want to leave or join the route at intermediate junctions. Dropped kerbs are missing at various locations where such a turn may be required.
And footway parking on the opposite side this time.
Comments reflect the views of the original submitter only.