Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | bollards, construction, cycleparking, cycletrack, ncn756, twoway, work |
Date time: | 3.30pm, Thursday 3rd June, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Construction work at Clyde Place, including a replacement cycle path and cycle parking. The riverside path is open (to the right).
Comments reflect the views of the original submitter only.