Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cycleway, incomplete, surface, tactiles, underconstruction |
Date time: | 5.21pm, Sunday 13th June, 2021 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
A new section of cycleway has appeared on Craighall Road and the correct Cycleway tactile slabs have been used. I'm going to have to have another look at that central dividing strip though. The surface has been left incomplete.
Comments reflect the views of the original submitter only.