Add to Gallery: | Add this photo to a Gallery |
Category: | A narrow place, difficult for cycles to pass.: A problem that needs to be fixed |
Tags: | cyclediversion, fallensign, memorialgardens, pedestriandiversion, redundantsign, scarboroughbridgetoousebridgefloodscheme, wellingtonrowesplanadelivediversion, wheelchairroute, york |
Date time: | 1.44pm, Friday 6th August, 2021 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Update: JN Bentley contractors righted this very soon after it was reported.] [Image taken 6.8.21] West Esplanade, York. This is part of the wheelchair/pedestrian/cycle diversion route for the Scarborough Bridge to Ouse Bridge Flood Scheme. Signs are vulnerable to weather and people. When they fall they are redundant and constitute hazards. See also: #172871. All images today: #172861 and links.
Comments reflect the views of the original submitter only.