Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | a804, anderston, cop26, crossing, desireline, flyover, m8motorway, motorway, pedestrian, rail, ramp, station, waiting |
Date time: | 1.01pm, Monday 30th August, 2021 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The area underneath the M8 motorway at Anderston Cross is being painted a couple of months before the COP26 conference hits town. The Anderston Bridge, Stobcross Bridge, and various roads are proposed to be closed during the conference, and this will become the main cycle diversion around the site.
The pedestrian crossing takes a rather long time to change.
Comments reflect the views of the original submitter only.