Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Event or temporary issue |
Tags: | b808, carparking, cycletrack, double-yellow, dyl, end, installation, pavementparking, trafficsignals, van, vanparking |
Date time: | 1.31pm, Friday 3rd September, 2021 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The first sign that the Benalder Street/Beith Street junction is going to be signalised, but no clues as to how the cycle track ending here will be tied into this.
The dropped kerb and crossing studs have not deterred these selfish drivers from parking on the footway.
Comments reflect the views of the original submitter only.