Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | cambridge, chisholmtrail, treeroot |
Date time: | 2.52pm, Saturday 4th September, 2021 |
Time line: | Earlier | Later |
Facing: | Bearing of 119° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
This section of the Chisholm Trail is built on a bed of gravel that is designed both to protect tree roots and the path from the roots causing ridges on the path. Only along a short stretch where trees grow on this side of the brook.
Comments reflect the views of the original submitter only.