Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: A problem that needs to be fixed |
Tags: | corduroy, incorrect, kerb, new, olddumbartonroad, pavementparking, tactiles, underconstruction, van, vanparking |
Date time: | 4.39pm, Sunday 19th September, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The lining on the new Old Dumbarton Road cycle track has been done, for the section that is complete (either end is still in construction), but there is still no way of crossing the road from the Bunhouse Road shared footway due to kerbs. The tactile paving is still incorrect corduroy (hazard) style instead of cycleway.
Comments reflect the views of the original submitter only.