Add to Gallery: | Add this photo to a Gallery |
Category: | Photos of parked cycles, on racks, railings, in shelters. Or photos of cycle racks themselves.: Other (infrastructure-related) |
Tags: | cyclelocker, cycleparking, filteredpermeability, firepath, hangar, keepclear, noentry, roadclosure |
Date time: | 2.37pm, Thursday 23rd September, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
A cycle hangar has been provided next to the Wilton Street Fire Path, but the Fire Path itself has still not been adapted to allow cycling through.
UPDATE AUGUST 2022: Enforcement of the parking elements of the North Kelvinside scheme has now commenced, but still no work has been done to implement the sole cycle item in the traffic order, namely permitting cycling through this Fire Path.
Comments reflect the views of the original submitter only.