Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | bowline, cycleparking, ncn7, path, railwaypath, ramp, sign |
Date time: | 11.52am, Sunday 7th November, 2021 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Dunbartonshire |
The start of the Bowline viaduct. Steps and a ramp connect the path to the canal towpath off to the right.
Comments reflect the views of the original submitter only.