Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | cutback, foliage, marrtree, offroadsegregated, resolved, stirlingroad, york |
Date time: | 10.07am, Thursday 16th June, 2022 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 16.6.22] Stirling Road, York. The greenery on the edge of the Marrtree site had taken over the pedestrian side of the offroad segregated route. It further reduced the already inadequate sightline. I saw today it has been cut. Other image here today: #183604. Context: #172713.
Comments reflect the views of the original submitter only.