Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 12.05pm, Friday 5th August, 2022 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Faversham |
All stepped underpasses and all footbridges should be equipped with bicycle wheel channels to allow cyclists to use them with ease.
Comments reflect the views of the original submitter only.