Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, trumpingtonmeadows |
Date time: | 3.40pm, Monday 22nd August, 2022 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | jtn20 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Junction of newly resurfaced foot/cycle link from Trumpington with the guided busway.
Comments reflect the views of the original submitter only.