Add to Gallery: | Add this photo to a Gallery |
Category: | Photos of parked cycles, on racks, railings, in shelters. Or photos of cycle racks themselves.: A problem that needs to be fixed |
Tags: | bikeparking, closetoentrance, cycleparking, jamesstreet, measurements, screwfix, sheffields, tooclose, undercover, york |
Date time: | 11.00am, Saturday 17th September, 2022 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 17.9.22] Screwfix, James Street, York. [Note: No street view at this location.] Both the cycles in the shelter belong to staff. There is no room for customers' cycles. Not only are the supports to close together but there is just 15cm between the uprights and the shelter sides. That's a loss of two spaces that can often be used by larger designs of cycles including those used for cycles for carrying people or goods, by people with mobility issues: #185679, #183747. The new space created by the addition of poles and a chain. Discussion of the amount of space - 80cm plus 1m: #186209. Other images here today and links #186206.
Comments reflect the views of the original submitter only.