Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | austria, kienbergwand |
Date time: | 8.28pm, Friday 21st October, 2022 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo/rob |
The Kienbergwand tunnel, about 1km long and parallel to the road tunnel - there are a couple of rock windows looking over the Mondsee.
Comments reflect the views of the original submitter only.