Add to Gallery: | Add this photo to a Gallery |
Category: | A sign, usually on the cycleway network, indicating a route for cycling.: Event or temporary issue |
Tags: | action, diversionsign, haughtonroad, measurements, northerngasnetworks, ratcliffestreet, reported, result, york |
Date time: | 3.35pm, Thursday 10th November, 2022 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[NOTE: 21.11.22 This sign - and another at the junction of Haughton Road and Field View - needs now to be removed. The works have finished. I will email to request this.] [UPDATE: At 16.15 this sign was still in this position and obstructing the pavement. I chased by email. When I passed again at 17.00 it had been moved into the road.] [UPDATE: I reported this obstruction by email at 16:17. I received a reply at 16:26: "Thanks for your email, I have spoken with the site manager who will speak with the traffic management company and arrange to have them positioned correctly."
[Image taken 10.11.22] Ratcliffe Street, junction with Haughton Road, York. Utilities are required to leave a minimum of 1m to enable wheelchair users to continue to use pavements safely. Between the sign and the wall capping there is just 45cm space. Between the frame and the wall is just 75cm space. I'm not sure even some of the dogs in this area will fit through the lower gap. This sign from the other side: #187654. And the company I believe it is connected to: #187655. Other image today and links: #187649.
Comments reflect the views of the original submitter only.