Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bunhouseroad, crossing, cyclesignals, detector, elephantfootprints, kelvin, wcw |
Date time: | 12.40pm, Friday 11th November, 2022 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Old habits die hard when there's months between installation and commissioning, and this cyclist, despite having triggered the detector, went straight to the pedestian crossing rather than waiting at the cycle signals.
Comments reflect the views of the original submitter only.