Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: A problem that needs to be fixed |
Tags: | cambridge, crossing, double-yellow, failure, greatnorthroad, speedtable |
Date time: | 2.38pm, Friday 25th November, 2022 |
Time line: | Earlier | Later |
Facing: | Bearing of 65° |
Added by: | simon |
Copyright: | Public domain |
Download: | View full-size original |
Area: | Cambridge |
There appear to be Belisha Beacons on those lighting columns, but they are covered with some kind of tape.
This looks therefore like some kind of failed attempt to construct a pedestrian crossing.
Comments reflect the views of the original submitter only.