Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | kingscross, london |
Date time: | 11.16am, Wednesday 30th November, 2022 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Camden |
Dropped kerb ahead where the building works finally close the cycleway and cyclists have to move to the shared-use area.
Comments reflect the views of the original submitter only.