Add to Gallery: | Add this photo to a Gallery |
Category: | A sign, usually on the cycleway network, indicating a route for cycling.: A problem that needs to be fixed |
Tags: | contradictorymessages, fossislandspath, northernpowergrid, obstruction, reported, routeclosed, york |
Date time: | 1.07pm, Saturday 10th December, 2022 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 10.12.22] Foss Islands Path, York. [NOTE: Location on street view approximate.] The main sign is very visible to everyone approaching the temporary blockage. It is (almost) correct: This is a cycle route (though not a ‘lane’) and footpath. The dates are here. But… it’s not closed 24/7, why is there no diversion for people on cycles? And why the mix of upper and lowercase letters? Other images this issue today – this (southern) end: #188682, #188683, #188684. Northern end and links: #188677. Other images today: #188672.
Comments reflect the views of the original submitter only.