Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | chiverton, cornwall |
Date time: | 11.33am, Monday 2nd January, 2023 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Bodmin |
End of shared-use path by the A30 Chiverton interchange - this bit might conceivably be used by a few crazed Land's End-John O'Groats riders using the A30, but no-one else.
Comments reflect the views of the original submitter only.