Add to Gallery: | Add this photo to a Gallery |
Category: | Any old sign: Event or temporary issue |
Tags: | None |
Date time: | 12.00pm, Wednesday 11th January, 2023 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | tomajeffs |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Bury |
New bridge construction across the river, to replace the existing (and dangerous) bridge slightly to the south. Expected to be open June 2023.
Comments reflect the views of the original submitter only.