Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | busway, crossing, histon, twitterimport |
Date time: | 10.58am, Monday 16th January, 2023 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | simon |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Source URL: | https://twitter.com/CyclingDadUK/status/1614940023899447296 |
Credit: | Cycling Dad [Twitter username: 'CyclingDadUK'] |
A thank you to @CambsCC! Work to improve signs at a Histon Guided Busway crossing has also removed an unnecessary barrier, improving the accessibility through this link. t.co/2PxJkyWjHP
Comments reflect the views of the original submitter only.