Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 1.20pm, Friday 27th January, 2023 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | tomajeffs |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Bury |
The cycleway as of January 2023 has received some much-needed leaf and mud clearance. The water you can see is mostly standing, there is a small trickle across the muddy part. Most of the sand and silt here has been cleared.
Comments reflect the views of the original submitter only.