Add to Gallery: | Add this photo to a Gallery |
Category: | Any old sign: A problem that needs to be fixed |
Tags: | diversionsign, fallensign, gasworks, northerngasnetworks, redundantsign, reported, skeldergate, temporarysign, update, york |
Date time: | 3.20pm, Wednesday 1st February, 2023 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[UPDATE: On 2.2.23 the utilities company responded: "I have spoken with the site manager and he will speak to team on site to get things rectified as soon as possible."] [Image taken 1.2.23] Skeldergate, York. Where should this sign be? It’s clearly not doing its job on the ground and is at risk of damage. Other image here today and links: #190584.
Comments reflect the views of the original submitter only.