Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | None |
Date time: | 8.13am, Monday 21st September, 2009 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | steinhardt |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Kevin Steinhardt |
Area: | Cambridge |
1 m / maybe 1.5 m of cycle lane.
Comments reflect the views of the original submitter only.