Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cs3, london |
Date time: | 6.17pm, Thursday 2nd February, 2023 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | City of London |
The Embankment cycleway (CS3) changes sides here for access to Blackfriars Bridge
Comments reflect the views of the original submitter only.