Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Other (infrastructure-related) |
Tags: | None |
Date time: | 1.22pm, Monday 29th June, 2009 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | steinhardt |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Work on the guided busway continueth, c. June 2009. The cycleway / maintenance track should be 3 m through Trumpington cutting when open. When that'll be is anyone's guess; 2025?
Comments reflect the views of the original submitter only.