Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | bottisham, highwaysreporting, overhanging, shareduse, vegetation |
Date time: | 10.56am, Wednesday 11th January, 2023 |
Time line: | Earlier | Later |
Facing: | Bearing of 214° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Ely |
Bell Road
The shared use cycleway is severely overgrown along here. A request has been made to clear it before the Reach Ride on 1st. May 2023:
highwaysreporting.cambridgeshire.gov.uk/
See also: #189410
Comments reflect the views of the original submitter only.