Add to Gallery: | Add this photo to a Gallery |
Category: | Any old sign: A problem that needs to be fixed |
Tags: | cyclistsdismount, roadworks |
Date time: | 5.38pm, Thursday 23rd February, 2023 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | soundandfury |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Repair works being undertaken by Cambridge Water. Looking at how much of the road ahead has actually been taken up with these roadworks (roughly half) I'm at a loss, once again, to understand why it is that cyclists are asked to dismount.
Comments reflect the views of the original submitter only.