Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 5.28pm, Monday 28th September, 2009 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
The new cycleway past the front of the UL.
(The primary objective of this cycleway was to stop cars parking along there.)
Comments reflect the views of the original submitter only.