Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | advisorycyclelane, bumpycyclelane, crichtonavenue, cyclelane, resurfacing, uneven, unevencyclelane, york |
Date time: | 1.31pm, Friday 17th March, 2023 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 17.3.23] Crichton Avenue, looking towards the junction with Intake Avenue, York. Resurfacing has created uncomfortable bumps. Is it due to be covered in green tarmac and made smooth? I'll ask CYC. Location: #192133. Other image today and links: #192125.
Comments reflect the views of the original submitter only.