Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 12.29pm, Monday 27th March, 2023 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Luton |
Signs here appear to predate the toucan crossings so you are signed to go south along the B579 and then pass under the railway via a non-existant route. The pavement on the north side of the road is only just wide enough for one bike. Road under the bridge should be reduced to one lane with traffic light control to prioritise pedestrians.
Comments reflect the views of the original submitter only.