Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | 50mph, a8renfrew, crossing, footway, shareduse, slip |
Date time: | 3.05pm, Sunday 4th June, 2023 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
The shared footway alongside the A8 heading away from the new M8 junction. The shared footway on the opposite side comes to an end and a dropped kerb crossing is provided. There is also a slip for joining that shared footway from the carriageway. The shared footway on this side continues right up to the edge of Renfrew.
I don't know what the temporary sign and barrier on the shared footway on this side were there for. The footway on the other side had been shut past the motorway junction.
Comments reflect the views of the original submitter only.