Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | 30mph, a8renfrew, bus, footway, garage, junction, shareduse |
Date time: | 3.20pm, Sunday 4th June, 2023 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
The shared footway alongside the A8 becomes at segregated footway and cycleway at Inchinnan bus garage, with the cycleway transferring onto the traffic island to avoid the entrance to the bus garage.
Comments reflect the views of the original submitter only.