Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 5.50pm, Monday 25th September, 2023 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | North Hykeham |
The connection from Melbourne Way to Hollywell Road only has a dropped kerb on one side, meaning that cycles need to use the narrow pavement rather than going straight from road to road. A dropped kerb should be added on the Hollywell Road side.
Comments reflect the views of the original submitter only.