Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 8.13am, Monday 21st June, 2010 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | richardm |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
No formal access to the GBW bridleway at Over Windmill Bridge. This cyclist has just climbed through the nature reserve and scrambled down the bank along a path that is becoming well worn.
Comments reflect the views of the original submitter only.