Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | construction, cycle, lane |
Date time: | 1.01pm, Tuesday 5th October, 2010 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | mitcml |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Colchester |
New cycle path under construction formally connecting Ypres Road to the Garrison Route.
Comments reflect the views of the original submitter only.