Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | construction, crossing, cycle, lane |
Date time: | 5.10pm, Wednesday 20th October, 2010 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | mitcml |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Colchester |
The long-awaited toucan crossing of Layer Road, linking the Boadicea Way cycle lane and Garrison route is taking shape.
Comments reflect the views of the original submitter only.