Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 6.45pm, Thursday 28th October, 2010 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | steinhardt |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Kevin Steinhardt |
Area: | Cambridge |
The start of the cycleway/maintenance track adjacent to the southern section of the Cambs Guided Busway, Trumpington Park & Ride. Nice incline/decline for cycleway users; the curve at the far right of the frame looks alright but the one at the bottom looks a bit tight. Also the usual practice of 90-degree dumping onto roads has occurred once more in-between those two blobs of white light at the top of the incline.
Comments reflect the views of the original submitter only.