Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | cycle, layers, path, segregated |
Date time: | 3.34pm, Wednesday 14th May, 2008 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Assen Study Tour |
A proper cycle path in the making. Several layer of gravel, concrete, tarmac and red-mac applied on Groningerstraat. This reduces problems with tree roots and frost.
Comments reflect the views of the original submitter only.