Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: An example of good practice |
Tags: | None |
Date time: | 12.21pm, Sunday 13th March, 2011 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | soundandfury |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Construction of the path at the end of the cycle bridge. (Taken with a phone.) See also #28940
Thankfully this lamppost has been moved out of the way - see #29140
Comments reflect the views of the original submitter only.