Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | cycleway, development, dropped, kerbs, niab, offstreet |
Date time: | 4.26pm, Friday 8th April, 2011 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Area: | Cambridge |
Access to the first section of the NIAB development off Huntingdon Road. The dropped kerbs don't seem to be right for off street cycleways? See also #30053 and #30054.
Comments reflect the views of the original submitter only.