Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | commonwealthgames, scsp |
Date time: | 2.54pm, Sunday 1st May, 2011 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Under-construction segregated cycle route on London Road, to link Glasgow Green and Commonwealth Games 2014 site at Parkhead. A coach was parked on the cycle track further along, completely blocking it. See also #30519
Comments reflect the views of the original submitter only.