Add to Gallery: | Add this photo to a Gallery |
Category: | A sign, usually on the cycleway network, indicating a route for cycling.: A problem that needs to be fixed |
Tags: | collegesroute, glasgow-cumbernauld, kerb, sign |
Date time: | 5.37pm, Wednesday 13th July, 2011 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The point where the Cumbernauld to Glasgow cycle route joins the redetermined footway (to the right only) of North Hanover Street. Not only do cyclists have to watch out for the step half way down the ramp, but the cycle route signs, on a single round pole, are pointing in random directions. No dropped kerb for cyclists wanting to join the carriageway either.
See also #31795.
Comments reflect the views of the original submitter only.