Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | grangeroad |
Date time: | 11.07am, Sunday 23rd October, 2011 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
At last! a year after Grange Road was resurfaced, the cycle lanes have been replaced.
Comments reflect the views of the original submitter only.